Roof replacement in Greater Milwaukeethe Phoenix valley
What a full tear-off actually involves, what goes on your house in what order, and how to tell a thorough job from a fast one.
Seven layers go on your house. You will only ever see one.
A roof is not a covering, it is a system. Each layer has a job that only matters on the day it is tested, and the layer you can see from the driveway is the least important of the seven.
| Layer | What it does |
|---|---|
| 1. Roof deck | The plywood or plank sheathing everything fastens to. If it is soft, nothing above it holds. This is the layer a homeowner almost never sees. |
| 2. Ice and water shield | A self-adhering membrane at the eaves, in the valleys and around every penetration. It seals around each nail driven through it, which ordinary underlayment does not. |
| 3. Drip edge | Metal at the eave, installed before the underlayment so runoff is thrown clear of the fascia. At the rake it goes on last, over the top. Getting this order backwards rots the fascia you just paid for. |
| 4. Underlayment | Covers the remaining deck, each course lapping the one below. This is the layer that catches whatever the shingles let past. |
| 5. Starter course | A sealed strip at the eave and rake. This is what actually holds the roof edge down in wind. A field shingle used as a starter puts the adhesive in the wrong place. |
| 6. Field shingles | The visible roof, laid so each course covers the fasteners of the one beneath it. |
| 7. Ridge vent and cap | Exhaust at the peak, balanced against intake at the soffit, capped in a shingle matching the field. |
Every layer laps the one below, so water always meets an overlap facing downhill. Install the same materials in the wrong sequence and they will carry water inward instead of out. Sequence is most of the craft.
What happens on the day
Before anyone climbs
Beds, shrubs and any exposed deck or patio are tarped. Vehicles come off the driveway. If the attic is accessible we look at the underside of the deck and the ventilation before the tear-off begins, because that is often where the real story is.
Tear-off
Everything comes off down to the bare deck, including the old underlayment and the old flashing. Metal that has done fifteen years does not get another fifteen. This is the point where the deck is visible, and where we photograph every square of it.
Deck inspection
Soft, delaminated or poorly fastened sheathing is marked. You get the photographs and a price before any of it is covered. On most homes this is somewhere between zero and six sheets. Anyone who tells you the number before the roof is open is guessing.
Dry-in
Membrane at the eaves and valleys, drip edge at the eave, then underlayment up the slope. The house is watertight at this point, which is why we do not leave a roof open overnight.
Field and detail
Starter, then field shingles up the slope, then the detail work: step flashing at every wall course, new pipe boots, counter flashing at masonry, valley metal. Detail work is where roofs leak and where corners get cut.
Close
Ridge vent and cap, magnet sweep of the lawn, drive and beds, gutters cleared of debris, and a walkthrough with you before the truck leaves.
How to tell a thorough bid from a fast one
- Does it name the products? "Architectural shingles" is not a product. A brand and a line is.
- Does it price the flashing separately? Step flashing, counter flashing, pipe boots and valley metal should be line items, not assumed.
- Does it say what happens if the deck is bad? A per-sheet price agreed up front prevents an argument later.
- Does it mention ventilation? A roof with no intake at the soffit will cook from underneath regardless of what goes on top.
- Does it include the starter and the ridge cap? Both are frequently left out to make a number look competitive.
Common questions
How long does a roof replacement take?
Most Milwaukee homes are one to two days: tear-off in the morning, dry-in the same day, and the field completed the next. A large or steep roof, or one with a lot of detail work, can run to three.
Can you go over the old shingles instead?
Wisconsin allows two layers, so it is sometimes legal. We rarely recommend it. An overlay hides the decking, so nobody knows what is under there, it traps heat which shortens shingle life, and the next roof costs more because two layers have to come off.
Do I need to be home?
No. Most customers are at work. We photograph the deck before it is covered so you see what we saw, and anything unexpected reaches you as a change order before it is closed up.
What happens to my landscaping?
Beds and shrubs are tarped before the first shingle comes off, decks and driveways are covered, and a magnet sweep runs across the lawn and drive at the end of each day.
Ready for a straight answer on your roof?
Free inspection, a written scope, and a fixed price before work starts. We will tell you honestly if it can wait another season.